In and out of furnace transplanter

Before entering the furnace, make the saggers neatly arranged in 4 rows, with a gap of 10mm, and use 8 rows of timing belts with the jacking cylinder to enter the replacement warehouse before the furnace at the same speed at the same speed;

The horizontal conveyor roller line and the transfer machine adopt integral frame conveying;

The two (or one) end faces of the frame are the same as the end faces of the independent roller line, that is, the connection mode with the line body is the same.

Tags:

Share